Flat Possession Electrical Checklist: What to Test Before You Sign
An electrical checklist for a new flat is a short list you walk through before signing the possession letter: the distribution board, earthing, every switch and socket, the 16A appliance points, and the papers the builder owes you. Below is the room-by-room walk-through we would give a friend collecting keys in Mumbai or anywhere in India, with what each check looks like, what common fixes cost at our MRP, and what to leave to a licensed electrician.
Key takeaways
- DB first — one labelled MCB per circuit, an RCCB, spare ways, own MCBs for ACs and the geyser.
- Every point — try each switch, fan speed and socket; load sockets with a charger or lamp; feel for warm plates.
- Ask for papers — earth and insulation test readings, a wiring drawing, a DB schedule and warranty details.
- Check, don’t open — anything behind a cover is for a licensed electrician, with the MCB off and the circuit tested dead.
- Parts are cheap — a KEMPS K141 switch is ₹65 and a VIYONA 401 MCB ₹145 MRP; wall work after move-in is not.
Electrical checklist for a new flat: the short answer
An electrical checklist for a new flat covers five things before you sign the possession letter: the distribution board, the earthing, every switch and socket, the heavy-appliance points, and the papers the builder owes you. Each one takes minutes to check on the day and far longer to fix once your furniture, modular kitchen and false ceiling are in.
Possession day in a new building, in Mumbai or anywhere else, is usually rushed. The builder’s team wants a signature, the flat looks finished, and the walls hide everything that matters. That is exactly why a written list helps. You are not inspecting the wiring inside the walls; you are checking what the wiring does at every point, and asking for the records that prove the rest.
We make the parts a flat’s wiring ends in: switches, sockets, MCBs and MCB boxes, at our works in Marol, Andheri East, Mumbai. This guide is the walk-through we would give a friend collecting the keys. It is for checking, not repairing: anything that needs a cover opened is a job for a licensed electrician, with the MCB off and the circuit tested dead first.
What should you check in a new flat’s electrical work?
In a new flat, check that the distribution board is labelled with one MCB per circuit and an RCCB, that every switch, light, fan and socket works, that heavy appliances have 16A points, that 3 pin sockets are earthed, and that the builder hands over test readings and a wiring drawing.
Split the job into what you can see and what you must ask for:
You check: Every switch and light Every socket Fans and regulators DB labels and spare ways Loose or crooked plates
You ask for: Earth resistance reading Insulation test reading Wiring layout drawing Sanctioned load
Our house electrical layout plan shows how many points a typical 2BHK carries, which is a useful yardstick: if a bedroom has one socket where you expected three, find out now. For the checks a home needs year after year, once you have moved in, use our home electrical maintenance checklist.
Do the walk-through in daylight with the mains on. You need power to test points, and daylight to see scorch marks, gaps and crooked boxes.
| Area | What you check | A pass looks like | Ask the builder for |
|---|---|---|---|
| Distribution board | Labels, MCB per circuit, RCCB, spare ways | Every way labelled, no gaps, no scorch marks | DB schedule on paper |
| Earthing | Earth pin at heavy points, no tingles | 3 pin sockets wherever metal appliances go | Earth resistance reading |
| Switches and sockets | Every point works, plates flush | Firm click, firm plug grip, no warmth | Make and licence numbers |
| Heavy appliances | 16A points for geyser, AC, kitchen, washer | A matching 16A point at each | Circuit and MCB per heavy load |
| Kitchen and bathrooms | Points away from water and the hob | Bathroom switches outside the door | Point positions on the drawing |
| Papers | Drawing, readings, sanctioned load | All handed over and signed | Snag list signed and dated |
How do you check the distribution board (DB) at possession?
Open the DB door, without removing any cover, and check that every MCB has a printed label naming its circuit, that ACs and geysers each have their own MCB, that an RCCB is fitted, that spare ways are left for later circuits, and that the incoming main switch is marked.
Things to look for, all visible from outside the cover:
One MCB per circuit Labels on every way RCCB fitted? Spare ways free Scorch or melt marks Missing blanking plates
Read the face of each MCB. A genuine one carries its rating, breaking capacity and an ISI mark with a licence number; our VIYONA MCBs are 10 kA, made to IS/IEC 60898-1 under licence CM/L-2544151. A gap in the row of breakers should be closed with a blanking plate, never left open.
A box with every way already used leaves nowhere for a future AC. Our MCB box size list shows how many ways a flat usually needs, and our isolator vs MCB guide explains the main switch at the top of the board.
MRP of our SPN white line MCB boxes by size
MRPs from our current catalogue, bars to scale with ₹950 as the full bar. Box only; MCBs are extra.
Labelled MCBs, an RCCB and spare ways tell you most about the job.
A charger and a lamp test sockets and lights without opening anything.
Test readings and a wiring drawing make every later repair cheaper.
Signed and dated, with photographs of each fault.
How to check wiring in a new flat without opening walls
To check the wiring in a new flat without opening walls, switch every light, fan and socket on and off, load each socket briefly with a phone charger or a lamp, feel plates for warmth after use, look for scorch marks, and ask the builder’s electrician for written insulation and earth test readings.
The walls hide the cable, but the cable shows itself at the ends. A loose terminal shows as a warm plate, a buzz or a flickering light. A wrongly looped circuit shows as a switch that controls the wrong light, or a socket that only works when a light is on.
Look at the cable where it enters the DB, without touching it. House wire carries its size and standard printed on the sheath: 1.5 sq mm is common practice for lights and fans and 2.5 sq mm for sockets, with heavier sizes for AC and geyser circuits, as our house wire guide explains. Ask which brand and size went in, and note it.
The checks that need instruments, an insulation resistance test and an earth resistance test, are for a licensed electrician. Ask for the readings on paper and keep them with your possession documents.
Never open a switch plate, socket or DB cover to look inside. Switch off the MCB and test the circuit dead first, and leave that work to a licensed electrician.
Which points need 16A, and how do you spot them?
Points for heating and motor loads need 16A: the geyser, every AC, the microwave or oven, an induction hob, the washing machine, the fridge in many homes, and the iron. You can spot a 16A socket by its larger, wider-spaced holes, which take the big 3 pin plug that a 6A socket cannot.
Walk the flat with your appliance list and check each one has a matching point:
Geyser: 16A or higher AC: 16A socket or DP switch Kitchen counter: 16A Washing machine: 16A TV, chargers, lamps: 6A
If a heavy appliance has only a 6A socket nearby, the fix is a new point, not an adaptor. Our 6A vs 16A socket guide draws the line appliance by appliance. For the kitchen and bathrooms, which carry most of a flat’s heavy loads, see our guides to kitchen electrical points and bathroom electrical points.
MRP of 16A sockets we make, if a point must be added or upgraded
MRPs from our current catalogue, bars to scale with ₹205 as the full bar. The 153 and K193 are 6 and 16A universal sockets with shutters.
A heavy appliance run from a 6A socket through an adaptor or an extension board overheats the plug and socket. Ask for a proper 16A point before you sign.
How do you check earthing in a new flat?
You check earthing in a new flat by asking the builder’s electrician for the earth resistance reading, taken with an earth tester at the earth pit or main earth terminal, and by confirming that every 3 pin socket and every metal-bodied appliance point has its earth wire connected, which only an electrician can verify.
From outside, you can do three things. Confirm every heavy-appliance point is a 3 pin socket, not a 2 pin one. Ask where the earth pit or earth bus for the building and your flat is. And note any tingle from a tap, a geyser body or an appliance during the walk-through, which must be reported at once.
What a line tester cannot do is prove earthing. A neon tester glows on a live phase, nothing more. Our guide on how to check earthing at home covers the safe checks, and types of earthing explains plate, pipe and rod earthing in buildings.
If any metal part gives you a tingle, stop the walk-through, switch off at the MCB and have the builder’s electrician find the fault before possession.
Room-by-room flat possession checklist
Go room by room with a printed plan, and in each room try every switch, fan speed and socket, check the plate sits flush, and compare the points with the drawing you were sold: bedrooms for bedside and AC points, the living room for TV and data, the kitchen and bathrooms for heavy loads.
Bedrooms A door board for light and fan, a bedside board, ideally a 2 way switch for the main light, and an AC point high on the wall. Our 1 way vs 2 way switch guide shows how to test one: the light should switch from either end.
Living room TV sockets at the height of your TV unit, a TV and an RJ45 point if promised, the main board, and the AC point.
Kitchen 16A points for each heavy appliance, a fridge point, chimney and RO points, nothing over the hob or under the sink.
Bathrooms Light and exhaust switches outside, a geyser point with a DP switch, no socket near the shower.
Balcony and utility A washing machine point above the machine, and any outdoor light with its cover shut.
Heights are agreed before plastering, and moving a box later means chasing the wall. If a height is wrong, record it now; our switch board height guide gives the common figures.
What should you look for on every switch board?
On every board, check that the plate sits flush and square without rocking, that each switch clicks firmly, that sockets grip a plug without wobbling, that low sockets have shutters where children live, and that switches and sockets carry an ISI mark with a licence number.
A rocking plate usually means the concealed box behind it was set crooked in the plaster. Our guide to the junction box vs concealed box explains what sits behind a board, and our concealed box page lists the sizes.
For low sockets in a home with young children, ask for shuttered sockets; we make them across our ranges, such as KEMPS K192 and the VIZA V262 2 pin socket with shutter at ₹78. A plain socket can be swapped for a shuttered one later without touching the wall.
For marks, switches are made to IS 3854 and plugs and sockets to IS 1293. Our guide to IS codes for electrical products lists the rest, and how to spot a fake ISI mark shows how to check a licence number.
KEMPS K141 is a 10AX 1 way modular switch at ₹65 MRP, so replacing a stiff or cracked switch costs little. Note it on the snag list and let the builder fix it.
What do common electrical snags cost to fix?
Most electrical snags in a new flat cost little in parts: a 6A socket or a modular switch costs well under ₹100 at our MRP, a single pole MCB ₹145 and a 32A DP switch ₹330, so the real cost of leaving a snag is the labour and the wall work after you move in, not the part.
Parts cost of common snag fixes at our MRP
MRPs from our current catalogue, bars to scale with ₹350 as the full bar. Parts only; labour and any wall work are extra.
The numbers make the point: parts are cheap, chasing a wall is not. A missing 16A point found after the modular kitchen is fitted means cutting tiles or cabinets. A box set crooked behind a TV unit means moving furniture.
That is why the snag list matters more than its size suggests. For a fuller picture of what wiring and fittings cost, see our guide to house wiring cost.
Which documents should the builder hand over?
The builder should hand over a wiring layout drawing showing every point and circuit, a DB schedule naming each MCB, written earth and insulation test readings, the sanctioned load and meter details, and the make and warranty papers for the switches, sockets, MCBs and wire used in the flat.
Wiring layout saves money at every later repair, because the next electrician knows where cables run before drilling. DB schedule is the label list, on paper. Test readings show the wiring passed when it was handed over.
Sanctioned load matters if you plan more ACs than the builder assumed. Our guide on electrical load calculation shows how to add up your appliances, and our single phase vs three phase guide covers when a flat moves to three phase supply.
Make and warranty tells you whose parts are in the walls. A switch or MCB with a licence number you can check is a better sign than a logo alone.
Get every promise in writing on the snag list, signed and dated by the builder’s representative. A verbal “we will fix it” is hard to chase once the site team moves on.
What should you take on possession day?
Take a printed floor plan, a phone charger and a small lamp to test sockets, a torch, masking tape and a marker to label faults, your phone for photographs, and a neon line tester if you have one, used only to see whether a socket has a live phase.
The kit is simple on purpose: charger lamp torch tape and marker line tester. Plug the charger into every 6A socket and check the phone shows charging. Use the lamp to confirm light points that have no bulb.
VIYONA 811 is a line tester at ₹36 MRP, and the 812 is ₹42, both on our line tester page. A line tester glows when its tip touches a live phase. It does not prove a circuit dead and does not test earthing; our guide on how to use a line tester explains its limits.
Use a line tester only on a socket’s hole from the front, never on bare wires. Do not open anything; if a point needs opening, it goes on the snag list for a licensed electrician.
Resale flat or new flat: what changes in the checklist?
For a resale flat, the checklist adds the age and condition of the wiring itself: ask when it was last rewired, look for old round switches, fuse carriers instead of MCBs, two-pin-only sockets and brittle or taped cables, because an older installation may need rewiring rather than a few snag fixes.
Signs that point to rewiring: fuses instead of MCBs no earth pin at sockets cracked or brittle insulation frequent trips warm switches. Our guide on when to rewire a house covers each one, and our maintenance checklist explains old wiring colours.
A new building’s flat flips the risk: wiring is new, so the problems are installation mistakes, missing points and unlabelled boards rather than age. In Mumbai, add one seasonal check to both: look for damp patches near outer-wall boards before the monsoon, because seepage into a switch box causes trips and sparking.
Whichever flat you take, keep the snag list, test readings and drawing in one folder. They make every later repair faster and cheaper.
FAQs
What is an electrical checklist for a new flat?
How do I check the wiring in a new flat?
Can I check earthing with a line tester?
Should a new flat have an RCCB?
What documents should I get for the electrical work at possession?
What does it cost to fix a missing socket or faulty switch?
Why buyers choose Vinayak Electricals
- Switches, sockets, MCBs and MCB boxes made at our own works in Marol, Andheri East, Mumbai.
- Switches to IS 3854 under licence CM/L-7567794; MCBs to IS/IEC 60898-1 under CM/L-2544151.
- 10 kA VIYONA MCBs from ₹145, and SPN MCB boxes from ₹380 MRP.
- Shuttered sockets and 16A points across KEMPS, VIZA and VIYONA ranges.
- MRPs published openly; 500+ dealers and delivery across India.
- Manufacturing since 1995; ISO 9001:2015 certified.
MCBs and boxes for a properly built board
See codes, poles and MRPs for our 10 kA VIYONA MCBs, isolators and MCB boxes, then order through a dealer or call us.
View VIYONA MCBs